Categories: Headlines

LNP – Cause of island-wide power outage revealed

An ‘emergency situation’ at the Panadura grid substation has caused the island-wide power outage, the Ministry of Power and Energy revealed.

Power and Energy Minister Kumara Jayakody has revealed that the island-wide power outage was caused by a monkey falling on to the power lines at the grid substation in Panadura.

A sudden power cut was reported across the island earlier today (09).Â

Accordingly, the Ceylon Electricity Board (CEB) says that the System Control Centre of the CEB is currently in the process of resolving the island-wide power outage and restoring the supply.

Tyronne Jayamanne

Recent Posts

LNP – New ‘Ella Odyssey Nanu Oya’ train service to begin today

A new train service named ‘Ella Odyssey Nanu Oya’ will commence today (10), operating from…

6 hours ago

LNP – More power cuts ahead? – CEB to decide today

The Ceylon Electricity Board (CEB) is expected to decide today (10) whether power cuts will…

6 hours ago

LNP – FitsAir expands Dhaka operations with additional weekly flights

FitsAir, Sri Lanka’s leading low-cost airline, has announced the expansion of its Colombo-Dhaka service with…

6 hours ago

LNP – Sigiriya crowned World’s Most Welcoming City for 2025

Sigiriya has been crowned the world’s most welcoming city for 2025 by Booking.com, based on…

7 hours ago

LNP – Four arrested over Jaffna kidnapping and Rs. 8 Mn fraud

Four suspects, including a woman, have been arrested by Jaffna police in connection with the…

9 hours ago

LNP – President leaves for UAE

President Anura Kumara Dissanayake departed Sri Lanka for the United Arab Emirates (UAE) today (Feb.…

9 hours ago